Wirelessgy
Prototyyppikehitysyhtiö

3

Working demonstrators

~1

Bench range in metres

0

Independent measurements

2,500

Saatavilla olevat yksiköt

Varaprototyyppi $500.00

2,500 varausajat - rajoitettu saatavuus

Registered legal entities only. Company name, PIB and MBR are required at checkout. Consumers cannot reserve a unit.

Engineering status

Built and demonstrated. Not yet independently measured.

Built by a founder with an M.Sc. in electrical and computer engineering. The prototype couples a transmitter and a receiver through an oscillating electric field between conductive surfaces, so there is no coil pair and nothing to align. Bench observations indicate power transfer at roughly one metre. These are founder-observed results on hand-built hardware, presented as indicative only, pending independent measurement.

Demonstrated on video

Three functional demonstrators: a bench transmitter and receiver pair, a cordless LED lamp, and a USB charging puck. Named in the United Inventors Association UIA Inspire Top 24 of 2024 - recognition of the concept, not a technical measurement.

Non-magnetic coupling

Operates without induction coils, Magneettinen kytkentä, or directed energy beams.

Not independently verified

Efficiency, range and field-exposure figures have not been replicated or measured to a published protocol by any third party.

Not certified

No FCC, CE or other certification. Informal checks with consumer devices in and around the field showed no observable disruption, but formal EMC and human-exposure measurement has not been carried out.

Why say it this way

Open to scrutiny

A one-person hardware project with a working prototype and no independent measurements. What it needs next is a laboratory willing to measure it and an engineer willing to sign the result. The reservation batch is open to companies who want a unit on their own bench while that work is done.

Coupling

What is claimed

Power transfer at roughly one metre, observed on the bench, with no alignment and improved behaviour in water.

Construction

What is not claimed

No efficiency, range or exposure figure has been measured to a protocol, and no certification exists.

Why say so openly

Stating the limits

An unmeasured claim is worth nothing to a serious laboratory or industrial buyer. The buying company acknowledges the experimental nature of the device and accepts the usage risk on its own account.

Open to measurement

Varaa varhain ja osallistu

Secure your company a place in the FIFO batch (2,500). Reservations are open to registered legal entities only - company name, PIB and MBR are required.

Varaprototyyppi $500.00

2,500 rajoitettu prototyyppipaikkoja. Registered legal entities only. Varaus ei takaa välitöntä toimituksia.

Validation roadmap

What has been demonstrated, and what comes next

The first three items have been built and recorded. The remaining three have not been carried out. A published third-party test report is the asset this project needs next, and the reservation batch is what funds it.

Prototyyppitestaus

Done - bench transfer

A transmitter and receiver pair moving power across open space at roughly one metre, recorded on video. Founder-observed, not measured to a protocol.

Tekninen arviointi

Partly - informal checks only

Consumer devices placed in and around the field showed no observable disruption. That is a smoke test, not a measurement. Formal pre-compliance against FCC Part 18 and IEC 62311 remains outstanding.

Kokeellinen turvallisuusesittely

Not done - instrumented bench test

Calibrated power in and out, with an efficiency-versus-distance curve and error bars, repeated across builds.

Vedenalainen prototyyppitestaus

Done - submerged transfer

Power moved between two sealed electrodes in a water bath - the case induction cannot serve. Recorded, not quantified.

Poikkimateriaalitestaus

Done - two receivers, one transmitter

A cordless LED lamp and a USB charging puck running together anywhere on the same plastic surface, with no alignment and no touchable metal.

Eri prototyypit

Not done - independent replication

A university electrical engineering department or accredited test house rebuilding and re-measuring to the same protocol.

Varaprototyyppi $500.00

2,500 rajoitettu prototyyppipaikkoja. Registered legal entities only. Varaus ei takaa välitöntä toimituksia mutta varmistaa prioriteetin FIFO-jakelussa.

UKK

Usein kysytyt kysymykset

Langaton prototyyppi UKK
  • Who is allowed to reserve a unit?

    Registered legal entities only. Reservations are accepted from companies, institutes, universities and other registered organisations acting in the course of their business or research activity. Company name, tax identification number (PIB) and company registration number (MBR) are mandatory at checkout. Private individuals acting as consumers cannot reserve a unit. Orders that turn out to have been placed by a consumer are cancelled and refunded in full.

  • Mitä varaukseni kattaa ($500.00)?

    Varaus turvaa paikkasi alkuyksiköiden prototyypierässä (2,500). Se on palautuskelvoton. Ja takaa etusijan First-In-First-Out FIFO -jakelussa. Lopullinen toimitus tapahtuu vasta kun koko erä on rahoitettu ja laillisesti sallittu lähetettäväksi.

  • Milloin maksan jäljellä olevan saldon?

    $2,000.00 jäljellä oleva saldo veloitetaan vasta kun kaikki varaukset on kerätty (2,500), ja sääntelyhyväksyntä tai laillinen lupa lähetykselle vahvistetaan, tämä varmistaa turvallisuuden ja vaatimustenmukaisuuden.

  • What exactly has been proven?

    Three demonstrators have been built and recorded on video: a bench transmitter and receiver pair, a cordless LED lamp, and a USB charging puck. Power transfer at roughly one metre has been observed on the bench by the founder. No third party has measured any of it.

  • Is it certified or safety tested?

    Ei. There is no FCC, CE or other certification. Formal EMC and human-exposure assessment against FCC Part 18 and IEC 62311 has not been carried out. Informal checks with consumer devices showed no observable disruption, but that is not a measurement, and until one exists no claim about safe operating power levels can be made. This is precisely why units are supplied only to registered organisations for their own testing, never to consumers.

  • What about the patent?

    There is no live application. A utility provisional was filed with the USPTO under 35 U.S.C. 111(b) but was not converted within the twelve-month window, so there is no priority date today. An unconverted provisional is never published, so the implementation has not entered the public record. Patentability and freedom-to-operate opinions come before any new filing.

  • Entä jos toimitus viivästyy laillisten rajoitusten vuoksi?

    Toimitus tapahtuu vain jos se on laillisesti sallittua. Varaamalla, the buying company acknowledges that timing depends on independent measurement and regulatory clearance, not on an internal schedule.

Vaihe yksi - valmis

Työprosessi

Tämä projekti noudattaa ohjattua, asteittainen kehityssykli. Jokainen vaihe keskittyy tutkimukseen, vahvistus, ja hienosäätö turvallisuuden varmistamiseksi, kokeellinen, ja prototyyppilaitteen koulutuskäyttö.

Tutkimusvaihe

Alustava tutkimus ja teoreettinen mallintaminen langattoman energiansiirron periaatteista, prototyyppiin liittyvän toteutettavuuden ja turvallisuuden arviointi.

Vaihe kaksi - valmis

Prototyyppisuunnittelu ja -löytö

Iteratiivinen suunnittelu, testaus, ja optimaalisten konfiguraatioiden löytäminen. Varhaiset prototyypit rakennetaan laboratorioarviointia varten, lämpövakaus, signaalin eristys, ja hallittu energiantuotanto.

Löytövaihe

Tekniset iteraatiot hienosäätävät suunnitteluparametreja ja arvioivat ympäristövuorovaikutuksia varmistaakseen käsitteellisesti turvallisen kokeellisen käytön.

Vaihe kolme - odottaa

Validation - pending

Independent measurement, safety review and a repeatable build. Focus is on independent measurement, EMC pre-compliance and a repeatable reference design, alongside FIFO allocation of the reserved batch (2,500).

Prototyyppivalidointi

Kaikki varaukset seurataan, and independent measurement plus regulatory clearance are addressed before requesting the remaining payment and starting manufacturing.

  1. Tutkimus

    Teoreettisten ja kokeellisten periaatteiden tutkiminen pitkän matkan langattomassa energiansiirrossa.

  2. Löytö

    Exploring methods, materials and energy-transfer behaviours on the bench.

  3. Prototyyppisuunnittelu

    Alustavien testiprototyyppien rakentaminen kokeelliseen ja opetuskäyttöön.

  4. Vahvistus

    Independent laboratory measurement - not yet carried out.

  5. Erän suunnittelu

    Varausjärjestelyt, Ensin-sisään-ensin-ulos-jakoperiaate, ja valmistautuminen tuotantovalmiin prototyypin valmistukseen.

  6. Esituotanto

    Completing EMC and human-exposure testing before the final balance payment is requested and any unit is delivered.