Done - bench transfer
A transmitter and receiver pair moving power across open space at roughly one metre, recorded on video. Founder-observed, not measured to a protocol.
2,500 reservierungsslots - begrenzte verfügbarkeit
Registered legal entities only. Company name, PIB and MBR are required at checkout. Consumers cannot reserve a unit.
Built by a founder with an M.Sc. in electrical and computer engineering. The prototype couples a transmitter and a receiver through an oscillating electric field between conductive surfaces, so there is no coil pair and nothing to align. Bench observations indicate power transfer at roughly one metre. These are founder-observed results on hand-built hardware, presented as indicative only, pending independent measurement.
Three functional demonstrators: a bench transmitter and receiver pair, a cordless LED lamp, and a USB charging puck. Named in the United Inventors Association UIA Inspire Top 24 of 2024 - recognition of the concept, not a technical measurement.
Operates without induction coils, Magnetische Kopplung, or directed energy beams.
Efficiency, range and field-exposure figures have not been replicated or measured to a published protocol by any third party.
No FCC, CE or other certification. Informal checks with consumer devices in and around the field showed no observable disruption, but formal EMC and human-exposure measurement has not been carried out.
A one-person hardware project with a working prototype and no independent measurements. What it needs next is a laboratory willing to measure it and an engineer willing to sign the result. The reservation batch is open to companies who want a unit on their own bench while that work is done.
Power transfer at roughly one metre, observed on the bench, with no alignment and improved behaviour in water.
No efficiency, range or exposure figure has been measured to a protocol, and no certification exists.
An unmeasured claim is worth nothing to a serious laboratory or industrial buyer. The buying company acknowledges the experimental nature of the device and accepts the usage risk on its own account.
Secure your company a place in the FIFO batch (2,500). Reservations are open to registered legal entities only - company name, PIB and MBR are required.
2,500 begrenzte prototypenplätze. Registered legal entities only. Reservierung garantiert keine sofortige lieferung.
The first three items have been built and recorded. The remaining three have not been carried out. A published third-party test report is the asset this project needs next, and the reservation batch is what funds it.
A transmitter and receiver pair moving power across open space at roughly one metre, recorded on video. Founder-observed, not measured to a protocol.
Consumer devices placed in and around the field showed no observable disruption. That is a smoke test, not a measurement. Formal pre-compliance against FCC Part 18 and IEC 62311 remains outstanding.
Calibrated power in and out, with an efficiency-versus-distance curve and error bars, repeated across builds.
Power moved between two sealed electrodes in a water bath - the case induction cannot serve. Recorded, not quantified.
A cordless LED lamp and a USB charging puck running together anywhere on the same plastic surface, with no alignment and no touchable metal.
A university electrical engineering department or accredited test house rebuilding and re-measuring to the same protocol.
2,500 begrenzte prototypenplätze. Registered legal entities only. Eine Reservierung garantiert keine sofortige Lieferung sichert jedoch eine priorisierte FIFO-Zuteilung.
Registered legal entities only. Reservations are accepted from companies, institutes, universities and other registered organisations acting in the course of their business or research activity. Company name, tax identification number (PIB) and company registration number (MBR) are mandatory at checkout. Private individuals acting as consumers cannot reserve a unit. Orders that turn out to have been placed by a consumer are cancelled and refunded in full.
Die reservierung sichert ihren platz in der ersten prototypen-charge (2,500). Es ist nicht erstattungsfähig. Und gewährleistet Priorität bei der First-In-First-Out FIFO-Zuteilung. Die endgültige lieferung erfolgt erst wenn die gesamte charge finanziert und rechtlich für den versand freigegeben ist.
$2,000.00 der restbetrag wird erst angefordert nachdem alle reservierungen eingegangen sind (2,500), und die behördliche genehmigung oder rechtliche erlaubnis für den versand ist bestätigt, dies gewährleistet sicherheit und compliance.
Three demonstrators have been built and recorded on video: a bench transmitter and receiver pair, a cordless LED lamp, and a USB charging puck. Power transfer at roughly one metre has been observed on the bench by the founder. No third party has measured any of it.
Nein. There is no FCC, CE or other certification. Formal EMC and human-exposure assessment against FCC Part 18 and IEC 62311 has not been carried out. Informal checks with consumer devices showed no observable disruption, but that is not a measurement, and until one exists no claim about safe operating power levels can be made. This is precisely why units are supplied only to registered organisations for their own testing, never to consumers.
There is no live application. A utility provisional was filed with the USPTO under 35 U.S.C. 111(b) but was not converted within the twelve-month window, so there is no priority date today. An unconverted provisional is never published, so the implementation has not entered the public record. Patentability and freedom-to-operate opinions come before any new filing.
Die lieferung erfolgt nur wenn sie gesetzlich zulässig ist. Durch Reservieren, the buying company acknowledges that timing depends on independent measurement and regulatory clearance, not on an internal schedule.
Dieses projekt folgt einem kontrollierten, schrittweiser entwicklungszyklus. Jede phase konzentriert sich auf forschung, validierung, und verfeinerung zur sicherstellung der sicherheit, experimentell, und die pädagogische nutzung des prototypgeräts.
Erste forschung und theoretische modellierung von prinzipien der drahtlosen energieübertragung, bewertung der machbarkeit und sicherheitsaspekte des prototyps.
Iteratives design, testen, und entdeckung optimaler konfigurationen. Frühe prototypen werden für laborbewertungen gebaut, thermische stabilität, signalldämmung, und kontrollierte energieabgabe.
Ingenieuriterationen verfeinern designparameter und bewerten umweltinteraktionen um konzeptionell sichere experimentelle nutzung zu gewährleisten.
Independent measurement, safety review and a repeatable build. Focus is on independent measurement, EMC pre-compliance and a repeatable reference design, alongside FIFO allocation of the reserved batch (2,500).
Alle Reservierungen werden verfolgt, and independent measurement plus regulatory clearance are addressed before requesting the remaining payment and starting manufacturing.
Erforschung theoretischer und experimenteller prinzipien der drahtlosen energieübertragung über große entfernungen.
Exploring methods, materials and energy-transfer behaviours on the bench.
Erstellung erster testprototypen für experimentelle und bildungszwecke.
Independent laboratory measurement - not yet carried out.
Reservierungen organisieren, First-In-First-Out-Zuordnung, und Vorbereitung auf die produktionsreife Prototypenfertigung.
Completing EMC and human-exposure testing before the final balance payment is requested and any unit is delivered.